Hitachi ABB To Provide Equipment For Hydroelectric Power Project In Dubai

0
346

THIS COMMENTARY IS PUBLISHED BY FITCH SOLUTIONS COUNTRY RISK & INDUSTRY RESEARCH and is NOT a comment on Fitch Ratings’ Credit Ratings. Any comments or data are solely derived from Fitch Solutions Country Risk & Industry Research and independent sources. Fitch Ratings analysts do not share data or information with Fitch Solutions Country Risk & Industry Research.

Hitachi ABB To Provide Equipment For Hydroelectric Power Project In Dubai

  • 26 May 2021
  • United Arab Emirates
  • Infrastructure

News: Hitachi ABB Power Grids will supply AC excitation systems to Andritz Hydro for 250MW Hatta pumped-storage power plant in Dubai. Dubai Electricity and Water Authority is developing the project, which includes the construction of a reservoir near the Hatta dam with 6.4mn cubic metres (cu m) of water capacity, and an upper reservoir with around 3.3mn cu m of water storage capacity. The project is scheduled to be commissioned in early 2024, according to a press release from Hitachi ABB.

This report from Fitch Solutions Country Risk & Industry Research is a product of Fitch Solutions Group Ltd, UK Company registration number 08789939 (‘FSG’). FSG is an affiliate of Fitch Ratings Inc. (‘Fitch Ratings’). FSG is solely responsible for the content of this report, without any input from Fitch Ratings.